5/4/2026

Article 33: Partitions and wall finishes

At the beginning of May, the site underwent a visible transformation. With Christophe, we installed the interior partitions on the ground floor, installed the support beams for the net and moved the staircase. These interventions finally make it possible to clearly define the volumes and give its final shape to the living space.

Meanwhile, the earth walls have progressed well compared to last month. We are now reaching the end of this phase: all that remains is the finishing coat and a few touch-ups to be carried out. The difference is notable; the house is starting to look like we imagined.

The technical networks are in place and the main structures are installed. The rest will consist of finalizing these last layers of coating and continuing the interior fittings related to the kitchen and bathrooms.