Build journal
Every stage of the build, article by article.
Article 32: Earth floor and technical networks
Article 31: A look back at the Origo festival
Article 30: Kitchen, shower and technical room
Article 29: Raclette evening
Article 28: Forgotten boxes and cut tiles: final adjustments
Article 27: The exterior is almost finished
Article 26: Tiles in the rain
Article 25: Sponge texture and vacation
Article 24: Smoothing and installation of panels
Article 23: Manufactures our own solar absorbers
Article 22: Finally windows
Article 21: The squirting begins
Article 20: The cork and the countdown
Article 19: Kittens and preparation of facades
Article 18: Roof problem: when water infiltrates
Article 17: Reinforcements from Geneva
Article 16: Technical installation in progress
Article 15: The house stands
Article 14: Preparations for lifting
Article 13: Mulled wine and raclette evening: break and thanks
Article 12: The load-bearing straw walls are made
Article 11: Under the snow
Article 10: Construction site routine: one wall per day
Article 9: Filling with straw: first attempt
Article 8: First boxes at the carpenter's
Article 7: Setting up the site: The awning becomes our HQ
Article 6: The foundations arrive – Installation of Krinner screws
Article 5: First lessons: when the water table plays tricks
Article 4: The first shovels are broken: the construction site has officially started
Article 3: Participatory weekend – Volunteers in action
Article 2: The straw harvest: when wheat becomes your home